
Maritime Zone Concession renewal
Renewal of the concession held by the corporation, with favorable municipal inspection (Ruling AIZ-0051-2023) and a rectified 831 m² area confirmed inside municipal administration, outside PNE affectation.

Corporate sale · Costa Rica · South Pacific coast
Opportunity to acquire a Costa Rican holding company with a beachfront concession ready for development, backed by advanced municipal and environmental filings.
The property
Flat parcel with direct access to a 14-meter public road and an existing footpath to the beach. Cadastrally registered (survey 6-15722-2024) inside the Puerto Nuevo coastal sector, adjoining State Natural Heritage land and a short distance from Ballena Marine National Park and Dominical Beach.
Residential project
The property includes a viable preliminary project to develop for a two-level residence designed by Architect Enrique Barascout. The project takes advantage of a unique setting surrounded by primary forest, with private beach access and open views of the Pacific Ocean and the coastal mountains. It is a beach house ready to build, with terraces, a swimming pool, a double garage, and spaces integrated with the natural surroundings.



Land location
Aerial views showing the exact position of the land facing the Pacific, between markers M94 and M95 in Puerto Nuevo.



Status summary
Four files are advancing in parallel and adding value to the corporation. The concession renewal already has a favorable municipal inspection; the State Natural Heritage land-use filing was expanded in 2025; the 222.08 m² reclassification now has a professional forestry study confirming Non-Forest coverage; and the 338 m² road area completes the operative polygon.
Municipality of Osa opens file 614-2022 to renew the Maritime Zone concession held by Desarrollos Puertocito Tres S.A.
Ruling AIZ-0051-2023 confirms 831 m² within municipal administration and outside State Natural Heritage affectation.
ACOSA–MINAE file ACOSA-PU-SRD-014-2022 is submitted for trails, conservation and protection over adjoining State Natural Heritage land.
An amendment adds 2,702.36 m² to protect the creek and coastal forest near the beach.
File 96-2026 includes a professional forestry study confirming Non-Forest coverage on 222.08 m² previously flagged as PNE.
The 338 m² road area is added to the project's operative polygon, completing access connectivity.
Municipality of Osa and MINAE rulings are awaited to consolidate project viability.
Active filings

Renewal of the concession held by the corporation, with favorable municipal inspection (Ruling AIZ-0051-2023) and a rectified 831 m² area confirmed inside municipal administration, outside PNE affectation.

Land-use application for trails, conservation and protection over the adjoining PNE. A 2025 amendment adds 2,702.36 m² covering a creek and coastal forest, expanding the stewardship footprint.

Reclassification of 222.08 m² previously flagged as PNE, backed by a professional forestry study confirming Non-Forest coverage — the basis for reincorporating the area into the concessionable polygon.

338 m² road area that integrates project access and connectivity with the public road, completing the operative polygon alongside the municipal and environmental filings.

Consolidated sum across the four filings that define the project's operative footprint.
Regulatory plan
Declared tourism-apt sector (Gazette N°163, 08/27/2013). Permitted use: single-family residence. Conditional uses: sport, ranchos, pools.
The opportunity
The transaction is structured as a 100% share transfer of Desarrollos Puertocito Tres S.A., preserving the concession, all municipal and environmental files, and continuity before MINAE. Built for investors seeking a consolidated position on Costa Rica's South Pacific coast, in a declared tourism sector with growing demand.
Contact
Write us to receive the digital file including surveys, official rulings, corporate standing and the forestry study.